About Us
Our Showrooms
Blog
Gallery
Policies
Lighting
Kitchen & Bath
Contact
Welcome!
482 East Pine Log Road, Aiken SC
|
(803) 641-0804
|
Sign In
Catalog
Decorative Lighting
Chandelier
Decor/Home Accents
Exterior
Fans
Flush Mounts
Foyer/Hall Lanterns
Furniture
Island/Pool Table
Lamps
Landscape Ltg.
Mini Chandeliers
Mini Pendants
Pendants
Sconces
Semi-Flush Mts.
Specialty Items
Utility
Bathroom Fixtures
Fan Accessories
Glass
Shades
Track Ltg.
Recessed Ltg.
Undercabinet
Lighting Controls
Directional Lights
Electrical
Control And Automation
Data Networking And Wireless
Electrical Boxes And Enclosures
Electrical Distribution Equipment
Electronics And Batteries
Fittings and Hardware
Fuses Relays And Circuit Breakers
Heating Ventilation And Air Conditioning
Lugs Plugs And Connectors
Safety
Testing And Measuring
Tools
Wire And Cable
Wire and Cable Management
Wire Raceways And Busways
Conduit and Fittings
Contact Us
Wishlist
0
ORDER PAD
Enter Item Number(s) to add to Cart
qty
+ Add a row
Submit
Return
Print
Email
Pre-Bent S Curve MonoRail
$
357
50
/ 1
Part Number:
9ZXE7
UPC:
00756460858896
Quantity:
pkgs
pcs
Add To Quote
Add To Quote
Add To Estimate
Add To Wishlist
Compare Item
Product Variations (2)
Product Overview
CLEAR MO HORIZ. S-CURVE S.NKL
Specifications
Details
Category:
Track Ltg.
Subcategory:
Track Accessories
Finish:
Nickel /vendors/vendorImages nickel.jpg
Style:
Contemporary
Option:
Title 20
Category:
Monorail Hardware
Finish:
Satin Nickel
Style:
Contemporary | Modern
Option:
Dry Rated
Bulb Dimmable:
False
Introduction Date:
01/01/2000
Ship Carton Height:
6.00
Ship Weight:
3
Special Features:
From the brand formerly known as Tech Lighting
Vendor Ship Method:
UPS Fedex
Warranty:
1 Year
Weight:
1.10
24 Volt:
False
Adjustable Head:
False
Cable Field Cuttable:
True
Cannot Ship To California:
False
Cannot Ship To Canada:
False
Damp Rated:
False
Dark Sky:
False
Dry Rated:
False
FWC Compliant:
False
Integrated LED:
False
Item Color 1:
Clear
Master Color:
White
Motion Sensor Included:
False
Photocell Included:
False
Replaceable Lamp:
False
Reversible:
False
Safety Rating:
ETL
Shape:
Pre-bent S-curve
Sloped Ceiling Compatible:
False
Solar Powered:
False
SORAA:
False
Stocking Type:
Made to Order
System:
MonoRail
Title 20:
False
Title 24:
False
Transformer Required:
False
Warm Color Dimming:
FALSE
WET IP65:
False
Wet Rated:
False
To:
From:
Subject:
Hello, take a look at this great item that I found at {storeDesc}.
Send Email